Skip to product information
1 of 9

Vesgantti

Vesgantti Queen Mattresses 12 Inch Hybrid Queen Size Mattress in a Box, Pillow Top Mattress Gel Memory Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Plush Feel

Vesgantti Queen Mattresses 12 Inch Hybrid Queen Size Mattress in a Box, Pillow Top Mattress Gel Memory Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Plush Feel

Regular price $346.48 USD
Regular price Sale price $346.48 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • 【Individual Pocket Spring 】- Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture
  • 【Vesgantti Luxury Support System 】- Luxury mutilayer foam and pocket spring support systerm not just providing better support for your body, but also can absorb more pressure come from your body and the spring, providing more buffers for your body. Fully relax your muscles, greatly improve your sleeping quality
  • 【Breathable and Healthy】- Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, comfortable and breathable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • 【Ultra Quiet 】- Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Make sure no one is stanting at the direction where the mattress is rolling out to prevent any unnecessary injury. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)

Overview

  • Brand : Vesgantti
  • Size : Queen
  • Product Dimensions : 80"L x 60"W x 12"Th
  • Top Style : Pillow Top
  • Cover Material : Polyester
  • Number of Layers : 8
  • Fill Material : Gel Memory Foam, High Density Foam
  • Special Feature : Pressure Relief, Breathable, Ultra Quiet
  • Color : White
  • Coil Type : Pocketed Coil
  • Item Weight 81.8 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 81.8 Pounds
  • : Item Firmness Description Medium Firm
View full details